Crossover work south of the station just about complete |
The disconnected east loop, which will become the freight line. Note the signal sitting in the middle of the track: one like this existed at Wiri as well |
The west loop is just about gone |
Various new signals now operating at the south end of the station |
New signals at the north end |
These posts are used by staff to tell the signalling system that a train is waiting to depart (in either direction). Another pair has been installed by the lift |
Tracks stored on the suburban track (Platform 3). Pits where the sleepers used to sit are also evident |
A forklift places track on the pile |
No comments:
Post a Comment