At the north, drains are still being installed |
![]() |
Drains are also still being installed at the south end of the platform |
![]() |
South of the platform, the formations look almost finished |
![]() |
Seats and other station furnishings have appeared |
![]() |
Some more work has finally been done on the carpark, with a footpath appearing behind the station building |
![]() |
The final track layout, both on its own and overlaid on the old layout |
![]() |
Stages 1 and 2: installing additional crossovers and cutting back the east loop |
![]() |
Stage 3: removing the old yard and signalling commissioning |
![]() |
Stage 4: Platform 3/4 construction |
![]() |
Stage 5: Platform 2 constrction |
![]() |
Stage 6: Mainline construction and finalisation works |