| Mast bases being installed at the north end of the station |
| Bases being installed at the south end |
| Platform 1 looks almost ready for sealing |
| A runaway siding is being built from Platform 4, the dock platform |
| The carpark hasn't seen much work since the station building was moved |
| Mast base construction south of Onslow Road. For now, electrification will finish just down the line, but will hopefully be extended to Pukekohe |
| The truck that pumps concrete into the holes drilled |
No comments:
Post a Comment