| A new station entrance sign has been installed (probably some time ago). The old one made reference to the three platforms and had MAXX branding |
| The end of Platforms 1 and 2 have been tidied up and now feature stairs onto the trackbed |
| Formation works continue, with a trench now having been dug |
| The new runaway siding from Platform 4 |
No comments:
Post a Comment